BBC
The same judge who in September stopped construction on the Amazon's $11bn Belo Monte dam...has reversed his decision...and allowed it to go forward.
Judge Castro Martins said the company has shown that construction would not harm local fishing...or interfere with the flow of the Xingu river.
Brasil contends that the 11,000 megawatts of electricity from the dam is badly needed...despite flooding 500 sq kms of the Amazon forest....and displacing 50,000 indigena peoples.
FOR PREVIOUS Post/Link details:
http://thehypervigilantobserver.blogspot.com/2011/09/brasil-judge-halts-belo-monte-amazon.html
Popular Posts
- VENEZUELA: China Will Help Finance 3 New Power Plants For $520 Million In Oil.
- POLAND: Palikot Already Stirring The Parliamentary Pot...With Request To Remove Crucifix.
- SERBIA / LIBYA : Are Serbian Mercenary Pilots Bombing Protestors In Tripoli?
- BRASIL: The Drug Crack Invades Slums...So-Called "Cracolandias."
- COLOMBIA: Santos OKs Destruction Of Rebel Houses.
- CHILE: Navy's Touring Tall Ship...Has Sordid Past.
- HONDURAS : 4 Nov. UPDATE: 176 Police Arrested For Corruption; Lobo Sacks His Top Cops...Sends Troops Into Sula, Tegucigalpa.
- MEXICO : 09 May UPDATE: Gas Tanker Explodes On Ecatepec Highway, Killing 24, Injuring 36.
- ITALY : Death And Disaster In Genoa Port; Cargo Ship Takes Out Control Tower; 7 Dead, 4 Injured.
- USA / COMMODITIES: Severe Drought Means Popcorn Prices Will Pop-up.
